[Case Study of Dam Installation] Slope Lift "Super Tower RN UP106RN"
In addition to maintenance specifications, it is installed for equipment transportation! It has been adopted for dam renovation work and underground stairs. *Video available.
The slope lift "Super Tower RN UP106RN" can be used for dam renovation work, underground staircases, slope work beside railway tracks, staircase renovation work, and slope work on highways. In the case of installation at the Yamba Dam, the total length of the rail is approximately 65 meters, and since the dam fills with water, the lift's rail also enters the water, so it was custom-made entirely of stainless steel. Additionally, it has been adopted for transporting equipment to the underground staircase of the dam, and because the staircase is curved, three units have been installed with a lift length of 25 meters each, divided into three sections. *Video available 【Product Installation Overview】 <Dam Installation Specifications> ■ Maximum rail length: up to 95 meters ■ The submerged rail sections are custom-made entirely of stainless steel ■ Used for transporting fuel, equipment, and floating objects for boats running inside the dam ■ Used while changing the stopping position of the lift according to water levels ■ Installed for transporting equipment to the underground staircase of the dam *Video available *For more details, please refer to the PDF document or feel free to contact us.
- Company:ユニパー
- Price:Other